|
This is the beginnings of the Convention Center Station
and bus staging yard. This steel structure was dropped into a hole
vertically, and the hole then filled with concrete. Another similar
structure was placed and filled next to it, and another next to that to
build a wall of columns that would be the structure that would keep Pine
Street in place as the hole for the staging area was dug.
next
|

|