|
In order to keep water out (part of the tunnel is below
sea level), the tunnel was lined with quarter inch Mylar before the final
layers of concrete were applied. There were 2 people on top of the
platform working when I made this picture, but they are not visible
due to the 15 minute length of the exposure.
next
|

|